Le groupe
Produit
R&D
Mission
Événements
Nouveauté
Où
Contacts
HOME PAGE
Les événements
Les nouveautés
January 26-29
INTERPLASTICA
Moscow (RU)
March 9-12
TIRES & RUBBER
Moscow (RU)
31 March – 1 April
Koplas Korea Int.Plastic & Rubber
Seul (Korea)
April 13-16
EXPOBOR
Sao Paulo (BRAZIL)
May 11-14
RUSCHEM
Moscow (RU)
May 25-28
PLASTPOL
Kielce (Poland)
11-13 October
Rubber Mini Expo
Milwaukee (USA)
October 27 - November 3
K2010
Düsseldorf (GERMANY)
2-5 November
MIDEST
Paris (France)
17-19 November
Int.Rubber Conference & Exhibition
Mumbai (India)
• Joints AVEC DEUX Mélanges DE caoutchoucs différents
• Système Bloc CFO
• Moules avec démoulage Automatisé
• NANO NOZZLES
• COLD RUNNER SYSTEM
Examples
• Mould Productivity
• FLASHLESS MOULDS
We manufactured some of them , when geometry and part dimensions made it possible
• RUBBER - METAL PARTS
One of our systems automatically checks if all the metal inserts have been loaded into the mould cavities.
• MAGNETIC PLATENS
... intended for the quick fitting - removal of moulds and cold runner systems to - from the press.
• ABRASIVE COMPOUND MOULDS
By using special procedures we can cut the cavities , also in big moulds, DIRECTLY INTO MOULD PLATES HARDENED at 52 - 54 Hrc. Long life and mould integrity are at their best when using abrasive compounds.
• HARD CHROME PLATING
System adopted by ORP Stampi since many years – Bright or Opaque chrome plating according to the type of compound – improves mould/tool life, easy demoulding of parts, leaves mould/tool in cleaner condition.
• METROLOGY CERTIFICATES
We certified each of the 2000 cavities in a mould for pharmaceutical industry.
• MOULD TRIALS
... for complex moulds , with customer ' s compound, to validate our construction.
• CUT- OFF MOULDS
When mould opens , the injection runners get automatically cut off , so reducing labour and excess cryogenic finishing
ORP STAMPI
- Conception production des moules pour O-ring, moules pour caoutchouc, moules pour articles techniques en caoutchouc